Wright Construction Services served as the Construction Manager for Florissant Valley Fire Protection District’s House #1 and House #2 and provided comprehensive budgeting, design, and construction services for the District.
Fire House #1 is 14,680 SF and includes an emergency generator, three engine bays, a full kitchen, and a board meeting room.
Fire House #2 is a 9,000 SF facility equipped with three engine bays and an emergency backup generator.