Jackson-Medgar Wiley Evers International Airport (JAN)
As General Contractor at Jackson International Airport, Wright Construction is replacing the Gate 4 passenger boarding bridge and its equipment. The work includes a new elevated walkway, new foundations, conditioned air, and electrical and mechanical upgrades.Read More…
Columbia Regional Airport | Columbia, Missouri
Wright Construction Services added a new passenger boarding bridge at Columbia Regional Airport, with pre-conditioned air, ground power and an aircraft potable water cabinet. As general contractor, Wright handled the work from procurement and installation through commissioning and close-out.Read More…
Holt High School | 3rd Floor Addition
The Holt High School Third Floor Addition added a new story on top of an existing two-story academic building, using column stubs built into the roof for future growth. Working above two occupied floors in one compressed summer, Wright framed the addition and had it weather-tight before students returned in the fall.Read More…
Liberty Elementary School
Wright Construction Services is building the new 97,000-square-foot Liberty Elementary School for the Waynesville R-VI School District on a 26.2-acre site. The school will include collaborative learning commons, a full-size gymnasium, a commercial kitchen and dining area, and two playgrounds.Read More…
Parkway ISC | McKelvey Elementary
The Parkway Instructional Service Center project added and renovated 64,000 square feet while the building stayed in use, including a new two-story classroom and cafeteria wing. After a three-month permitting delay, Wright cut the work from three phases to two and still finished safely and on schedule.Read More…
Wright City High School
Wright Construction Services delivered Wright City High School, a 122,245-square-foot, single-story school with four science labs, PLTW classrooms, an agriculture shop and a full athletic complex. A tilt-up concrete storm shelter, built to the ICC 500 standard, also serves as an auxiliary gymnasium.Read More…
North Point Campus & Athletic Facility
Wright Construction built the 660,000 SF North Point Campus for the Wentzville School District. The campus includes North Point High School, North Point Middle School, the REACH & Early Childhood Center, and a full athletic complex, serving students from early childhood through high school.Read More…
South Central Correctional Center
South Central Correctional Center is a mixed-custody facility on a 208-acre campus with capacity for up to 1,660 male inmates. Its six two-tier housing units were built with a cast-in-place tunnel forming system that sped up the schedule without lowering security standards.Read More…
Benton County Sheriff’s Office & Jail
Built by Wright Construction Services, the 24,300 SF Benton County Sheriff’s Office in Warsaw, Missouri, combines detention and judicial functions in one secure facility. It includes an 80-bed jail with room to expand and an on-site courtroom that removes the cost and risk of transporting inmates.Read More…
Webster County Justice Center
Wright Construction Services delivered the 56,100 SF Webster County Justice Center in Marshfield, Missouri, on schedule and within budget. The facility brings the County’s public safety and judicial operations under one roof, with a 110-bed detention center, the sheriff’s office and a jury courtroom.Read More…